our workshop in numbers

Customers
0
Countries
0

Annual Orders Quantity

0 +
Years of Experience
0 +

Our Procurement Process

  • Definition of functional requirements, performance specifications, intended use, and integration needs of the equipment.

  • Emphasis on system-level specifications rather than individual components.

  • Consideration of compatibility with existing infrastructure and systems.

  • Identification of Original Equipment Manufacturers (OEMs), system integrators, and specialized equipment vendors.

  • Strong focus on supplier’s experience, reputation, and track record in providing similar equipment.

  • Emphasis on technical capabilities, customization options, and after-sales support (installation, training, maintenance).

  • Evaluation of compliance with relevant industry standards and regulations.

  • RFQs outlining functional requirements, desired features, performance metrics, integration requirements, warranty expectations, and service level agreements (SLAs).

  • May involve specifying brands or preferred technologies if applicable.

  • Focus on obtaining quotes for complete equipment or systems, including all necessary accessories and software.

  • More complex contracts covering aspects like performance guarantees, acceptance testing procedures, installation and commissioning, training, maintenance agreements, and intellectual property.

  • Emphasis on warranty terms, liability, and service level agreements.

  • POs detailing the specific equipment model, configuration, accessories, software licenses, delivery location, installation requirements, and agreed-upon terms.

  • Monitoring manufacturing lead times and delivery schedules for potentially complex equipment.

  • Coordination of site preparation, installation, and commissioning activities.

  • Communication regarding any customization or configuration changes.

  • Verification of equipment model, configuration, accessories, and any visible damage during transit.

  • Acceptance testing based on predefined criteria and performance specifications.

  • May involve site acceptance testing (SAT) after installation.

  • Storage requirements based on the size, weight, and environmental sensitivity of the equipment.

  • Often involves milestone payments tied to delivery, installation, and acceptance testing.

  • Focus on building partnerships with key equipment vendors for ongoing support, upgrades, and future equipment needs.

  • Regular performance evaluation based on equipment reliability, uptime, support responsiveness, and overall satisfaction.

  • Collaboration on equipment lifecycle management and potential upgrades or replacements.

Hot Search & Sourcing Brands

滚动至顶部